OFF LIVE
FLEXGRID
Building the Backbone of AI
AI-Ready Digital Infrastructure · flexgridinfra.com

BUILDING THE
BACKBONE OF AI

Developing the infrastructure that powers the next generation of artificial intelligence.
From powered land and energy solutions to modular AI data centers and edge infrastructure — Flexgrid delivers the foundation for scalable AI deployment.

Power  →  Land  →  Infrastructure  →  Compute

Wherever power exists, we build modular-ready sites — then aggregate them into scale.

Our Infrastructure Get In Touch
The Problem

MOST AI INFRASTRUCTURE
PROJECTS STALL.

AI growth is no longer constrained by demand. It is constrained by access to the physical foundation. Most projects stall because they lack one or more of these four.

01
POWER

Securing scalable, reliable power is the single hardest constraint in AI infrastructure today. Without it, nothing else matters.

02
LAND

Sites with power availability, the right zoning, and proximity to fiber are scarce and slow to develop.

03
CONNECTIVITY

Carrier-neutral fiber and high-performance data transport are required for AI workloads — and often missing.

04
SPEED TO DEPLOYMENT

Traditional development takes years. AI capacity is needed now. Modular, deployable infrastructure is the answer.

FLEXGRID SOLVES ALL FOUR.
Power, land, connectivity, and speed — integrated into one development platform. That is the backbone of AI.
The Flexgrid Stack

FROM ELECTRONS
TO INTELLIGENCE.

Our entire company is one vertically integrated stack — every layer developed and connected by Flexgrid.

POWER SOURCES UTILITY · GRID INTERCONNECTION POWERED LAND SITES · ENTITLEMENTS · ZONING SOLAR + BESS GENERATION · STORAGE · MICROGRID MODULAR AI DATA CENTERS CONTAINERIZED · 1–20 MW · FIBER AI COMPUTE INFERENCE · GPU · EDGE ENTERPRISE AI APPLICATIONS · WORKLOADS · SCALE ENERGY INFRA COMPUTE
The Distributed Aggregation Model

SMALL SITES.
AGGREGATED SCALE.

While hyperscalers wait years for 100 MW single-site interconnections stuck in the transmission queue, Flexgrid takes the opposite path — and builds wherever power already exists.

~35 MILE RADIUS HUB FIBER 2.5 MW 5 MW 10 MW 5 MW 2.5 MW 20 MW DISTRIBUTION-CONNECTED · NO QUEUE AGGREGATE 50–100 MW AGGREGATED COMPUTE CLUSTER DELIVERED TO OPERATORS · NODIAC + SOLAR & BESS → LOWER POWER COST
01
FIND POWERED LAND

Even 2.5 MW at a distribution point is enough to start. Distribution-connected means no transmission queue, no multi-year study.

02
DEPLOY MODULAR DC

NeoCloud-style modular, containerized data centers — hyper-dense, liquid-cooling-ready, deployable in months, not years.

03
OPTIMIZE WITH SOLAR + BESS

Add behind-the-meter solar and battery storage over time to cut power cost and improve site economics.

04
AGGREGATE & DELIVER

Cluster sites within a ~35-mile radius into 50–100 MW of capacity, delivered to compute operators and Nodiac to deploy and monetize.

Distributed aggregation beats the interconnection queue. String enough distribution-connected sites together inside a tight radius and you manufacture 50–100 MW of logical scale — without ever triggering the bottleneck the rest of the industry is stuck in.

Proof of Concept

THE MODEL IS
ALREADY LIVE.

Our flagship site in Colorado City, Texas proves the distributed aggregation model end to end — solar generation energized today, with modular compute and storage in active development.

Flagship Site · Anchor Project
COLORADO CITY, TEXAS
Mitchell County · ERCOT West · Oncor-Interconnected
Solar Energized · Live
5 MW
Solar Farm
Operational
2 MW
Modular DC Compute
In Dev · Target Q4 2026
2.5 MW
BESS · 4-Hour
In Dev · Target Q4 2026
+5 MW
Second Project · Full Config
In Dev · Target Q3 2027

A 5 MW solar farm is energized and live today, supporting a 2.5 MW load. On the same site, 2 MW of modular DC compute and a 2.5 MW / 4-hour battery — charged directly from solar — are in active development, targeted for Q4 2026. A second 5 MW project replicating the full configuration — solar + battery + load + modular DC — is targeted for Q3 2027 at the same site. This is the distributed aggregation model, operating in the field and already repeating.

NEXT: ~50 MW IN THE PERMIAN BASIN

~50 MW of sites identified in the Permian Basin region for the same distributed aggregation model, in coordination with Oncor.

Identified · In Development
0States Evaluated
0Markets Active
0Ecosystem Partners
UTILITY-FIRSTDevelopment Model
What We Do

TWO PILLARS.
ONE PLATFORM.

Flexgrid integrates energy and AI-ready digital infrastructure under one platform — delivering the foundation required for scalable AI deployment faster than any traditional path.

ENERGY & POWER

Securing and optimizing the energy foundation required for AI. Powered land development, behind-the-meter solar, BESS, microgrids, grid interconnection strategy, and energy resiliency architectures.

Foundation Explore →
AI-READY DIGITAL INFRASTRUCTURE

Building AI-ready infrastructure from concept to deployment. Modular AI data centers, edge facilities, co-location, AI inference, GPU environments, network & fiber, and end-to-end site development.

Infrastructure Explore →

AI GROWTH IS NO LONGER CONSTRAINED BY DEMAND.
IT IS CONSTRAINED BY ACCESS TO POWER, LAND, CONNECTIVITY, AND DEPLOYABLE INFRASTRUCTURE.

Flexgrid exists to solve exactly this — integrating the energy and digital infrastructure layers that AI deployment depends on.

Development Pipeline

1,400+ MW
IN DEVELOPMENT

Active pipeline across two countries. Working towards deployment — US assets under utility review, India bids in process.

🇺🇸 United States — Flexgrid Digital Infra LLC
POWERED LAND
TX · Midwest · East Coast · Utility Direct
300 MW
In Development
SOLAR (BTM)
Behind-the-meter · TX · Midwest · East Coast
100 MW
In Development
BESS
Co-located · Solar & Powered Land Sites
100 MW
In Development
CO-LOCATION MODULAR DC
AI Inference · Distribution-connected
20 MW
Operational
Working directly with utilities · Distribution-connected · No transmission queue
TX · OK · KS · MO · IL · IN · OH · PA · NY · NC · GA · SC · VA · WV · KY · TN · MI · WI · MN · IA
🇮🇳 India — Flex Grid Infra Private Limited
AI INFERENCE DC
Modular · Solar+BESS Co-located
300 MW
In Development
SOLAR — PM-KUSUM
Govt. Scheme · Decentralized · Tier 2/3
200 MW
Bid Submitted
BESS
Co-located · AI Inference DC & Solar
100 MW
In Development
POWERED LAND
Industrial Parks · Data Center Campuses
300 MW
In Development
PM-KUSUM Scheme · Incorporated in India · Active development
United States

US OPERATIONS

TEXAS · MIDWEST · EAST COAST · UTILITY PARTNERSHIPS
300 MW
Powered Land
100 MW
Solar BTM
100 MW
BESS
20 MW
Modular DC

Distribution-connected sites across ERCOT and expansion states. Working directly with utilities — no transmission queue exposure.

TX · OK · KS · MO · IL · IN · OH · PA · NY · NC · GA · SC · VA · WV · KY · TN · MI · WI · MN · IA
US Markets →
India

INDIA OPERATIONS

TIER 1 · TIER 2 · TIER 3 CITIES · PM-KUSUM SCHEME
300 MW
AI Inference DC
200 MW
Solar PM-KUSUM
100 MW
BESS
300 MW
Powered Land

Flex Grid Infra Pvt. Ltd. developing modular AI data centers co-located with solar+BESS. Active PM-KUSUM bid pipeline.

PM-KUSUM · 200 MW · Bid Submitted

India Markets →
Why Flexgrid

BUILT DIFFERENT.
BY DESIGN.

Five principles that make Flexgrid the partner of choice for AI infrastructure development.

01
INTEGRATED EXPERTISE

Energy, land, connectivity, and data center development under one platform. No handoffs. No gaps.

02
AI-READY BY DESIGN

Purpose-built infrastructure optimized for AI workloads from day one — not retrofitted.

03
ACCELERATED DEPLOYMENT

Modular and scalable solutions that reduce time-to-market versus traditional development paths.

04
ENERGY-FIRST APPROACH

Infrastructure designed around reliable, efficient power. Energy is the foundation.

05
SCALABLE GROWTH

From edge nodes to hyperscale campuses — the same platform, engineered to grow.

Strategic Compute Partner NODIAC.AI — our modular AI compute deployment partner. Learn more →
Who We Work With

FIND YOUR PATH IN.

Whatever you bring to the table, there's a way to build with Flexgrid.

LANDOWNERS

Monetize your powered land. Turn sites with power and interconnection into AI-ready infrastructure revenue.

Monetize Your Land →
UTILITIES

Turn AI load growth into structured, distribution-connected development across your territory.

AI Infra for Utilities →
INVESTORS

Access US + India AI infrastructure opportunities across energy, digital infra, and compute.

Investment Opportunities →
OPERATORS

Deploy AI capacity in months, not years. We build the powered infrastructure underneath your compute.

Accelerate Deployment →
Development Focus

WHAT WE DEVELOP.

Flexgrid's development spans the full AI infrastructure stack — from the energy layer through to deployable compute.

POWERED LAND

Identification, acquisition, and development of sites with scalable power availability across 20+ states.

AI DATA CENTERS

Modular, rapidly deployable facilities engineered for high-density AI inference and compute workloads.

EDGE INFRASTRUCTURE

Distributed, low-latency compute closer to users and data — solar-powered nodes in Tier 2/3 markets.

ENERGY OPTIMIZATION

Behind-the-meter solar, BESS, microgrids, and power cost optimization securing the energy foundation.

MODULAR COMPUTE DEPLOYMENT

In partnership with Nodiac, modular AI compute deployed rapidly at Flexgrid-developed powered sites.

🌐
NETWORK & FIBER

Carrier-neutral connectivity and fiber infrastructure enabling high-performance data transport.

Work With Us

HAVE A SITE? HAVE POWER?
LET'S BUILD SOMETHING TOGETHER.

We work with landowners, IPPs, utilities, hyperscalers, and enterprise operators across the US and India.

Contact Us
Infrastructure

THE FULL STACK.
FROM POWER
TO COMPUTE.

Two integrated pillars. One platform. Delivering AI-Ready Digital Infrastructure from the energy foundation through to compute deployment.

Pillar 01
01
ENERGY & POWER

Securing and optimizing the energy foundation required for AI. Power is the first question we answer on every project — before a single rack is placed or a cable is pulled.

POWERED LAND DEVELOPMENT
Identification, acquisition, and development of sites with scalable power availability. 300 MW US pipeline in development.
BEHIND-THE-METER SOLAR
Onsite renewable energy solutions reducing operating costs. 100 MW US pipeline. 200 MW India under PM-KUSUM scheme.
BATTERY ENERGY STORAGE (BESS)
Energy storage solutions that optimize demand charges and grid utilization. 100 MW US · 100 MW India in development.
MICROGRIDS & DISTRIBUTED ENERGY
Integrated onsite generation and storage systems improving resiliency and energy independence.
POWER COST OPTIMIZATION
Strategies reducing energy costs through load management, storage, and operational efficiency.
GRID INTERCONNECTION STRATEGY
Planning and execution of utility interconnections. Working directly with utilities — distribution-connected, no transmission queue exposure.
ENERGY RESILIENCY & BACKUP POWER
Redundant power architectures ensuring uninterrupted operations for mission-critical AI workloads.
Pillar 02
02
AI-READY DIGITAL INFRASTRUCTURE

Building the compute environments that AI demands — from modular data centers and edge facilities to the fiber and connectivity layer that ties it all together. Purpose-built, not retrofitted.

MODULAR AI DATA CENTERS
Rapidly deployable facilities for high-density AI workloads. Containerized, 1–20 MW per site. Operational in months not years. 300 MW India pipeline · 20 MW US active.
EDGE DATA CENTERS
Distributed infrastructure delivering low-latency compute closer to users and data sources. Solar-powered nodes in Tier 2/3 cities across India.
CO-LOCATION FACILITIES
Flexible, scalable environments supporting enterprise and AI infrastructure requirements. Carrier-neutral, multi-tenant.
AI INFERENCE DATA CENTERS
Facilities optimized for AI inference and next-generation compute workloads. High-density, purpose-cooled, GPU-ready.
GPU INFRASTRUCTURE
High-density environments engineered for accelerated AI workloads — power density, cooling, and connectivity designed from first principles.
NETWORK & FIBER CONNECTIVITY
Carrier-neutral connectivity and fiber infrastructure enabling high-performance data transport across all deployments.
AI-READY SITE DEVELOPMENT
End-to-end development — site selection, permitting, design, and infrastructure planning for digital infrastructure projects.
The Business Model

BUILT FOR THE
NEOCLOUD ERA.

NeoCloud operators have abandoned multi-year hyperscale builds for modular, containerized, liquid-cooled data centers deployed close to power. Flexgrid develops the powered sites that make this possible — then aggregates them into scale.

~35 MILE RADIUS HUB FIBER 2.5 MW 5 MW 10 MW 5 MW 2.5 MW 20 MW DISTRIBUTION-CONNECTED · NO QUEUE AGGREGATE 50–100 MW AGGREGATED COMPUTE CLUSTER DELIVERED TO OPERATORS · NODIAC + SOLAR & BESS → LOWER POWER COST
THE FLEXGRID APPROACH
START WHERE POWER EXISTS
Even a 2.5 MW distribution allocation is enough to deploy a modular DC. No waiting for hyperscale-size interconnection.
MODULAR, NOT BRICK-AND-MORTAR
Containerized micro-pods supporting hyper-dense racks (120 kW+) with direct-to-chip liquid or immersion cooling, deployable in months.
LOWER POWER COST OVER TIME
Add behind-the-meter solar and BESS to reduce energy cost and strengthen each site's economics.
AGGREGATE INTO SCALE
Cluster sites within a ~35-mile radius, fiber-aggregated into 50–100 MW of logical capacity.
DELIVER TO OPERATORS
Aggregated capacity is delivered to NeoCloud operators and Nodiac, who deploy and monetize the compute.
WHY IT WINS
NO TRANSMISSION QUEUE
Distribution-connected sites ≤20 MW avoid the multi-year ERCOT transmission interconnection queue entirely.
SPEED TO POWER
Modular deployment in ~5 months versus 24+ months for traditional hyperscale builds.
LOGICAL SCALE WITHOUT THE BOTTLENECK
Aggregation creates 50–100 MW of sellable capacity without triggering large-load study requirements.
SITED NEAR RENEWABLES
Modular siting places compute close to power and renewable sources — exactly what NeoClouds need.
Get Started

READY TO DEPLOY
AI INFRASTRUCTURE?

Tell us about your site, your power, or your project.

Contact Us
Markets

TWO MARKETS.
ONE MISSION.

AI infrastructure development across the United States and India — 1,400+ MW in development pipeline, working with utilities, governments, and enterprise operators.

🇺🇸 United States

AI INFRASTRUCTURE ACROSS
AMERICA'S POWER BELT

Anchored in Texas and expanding across Midwest and East Coast states. Distribution-connected, direct utility partnerships.

🇺🇸 United States — Flexgrid Digital Infra LLC
POWERED LAND
TX · Midwest · East Coast · Utility Direct
300 MW
In Development
SOLAR (BTM)
Behind-the-meter · TX · Midwest · East Coast
100 MW
In Development
BESS
Co-located · Solar & Powered Land Sites
100 MW
In Development
CO-LOCATION MODULAR DC
AI Inference · Distribution-connected
20 MW
Operational
Working directly with utilities · Distribution-connected · No transmission queue
TX · OK · KS · MO · IL · IN · OH · PA · NY · NC · GA · SC · VA · WV · KY · TN · MI · WI · MN · IA
🇮🇳 India — Flex Grid Infra Private Limited
AI INFERENCE DC
Modular · Solar+BESS Co-located
300 MW
In Development
SOLAR — PM-KUSUM
Govt. Scheme · Decentralized · Tier 2/3
200 MW
Bid Submitted
BESS
Co-located · AI Inference DC & Solar
100 MW
In Development
POWERED LAND
Industrial Parks · Data Center Campuses
300 MW
In Development
PM-KUSUM Scheme · Incorporated in India · Active development
🇮🇳 India

POWERING INDIA'S
AI INFRASTRUCTURE LAYER

Flex Grid Infra Pvt. Ltd. developing energy-first, compute-ready infrastructure co-located with solar and BESS. 900 MW development pipeline.

AI INFERENCE DC
Modular · Solar+BESS Co-located
300 MW
In Development
SOLAR — PM-KUSUM
Govt. Scheme · Decentralized · Tier 2/3
200 MW
Bid Submitted
BESS
Co-located · AI Inference DC & Solar
100 MW
In Development
POWERED LAND
Industrial Parks · Data Center Campuses
300 MW
In Development
PM-KUSUM · Flex Grid Infra Pvt. Ltd. · Active development
Why India Now
IndiaAI Mission
Government of India's national AI development initiative driving infrastructure demand at scale.
PM-KUSUM Scheme
Decentralized solar for agricultural and rural sectors. 200 MW bid submitted.
Tier 2/3 Markets
Underserved compute capacity with strong renewable energy mandates and growing enterprise demand.
Own a Power Site?

WE'D LIKE TO TALK.

If you own land with power, have a site with interconnection, or want to discuss a market opportunity — reach out directly.

Contact Us
Partners & Ecosystem

INFRASTRUCTURE
MEETS INTELLIGENCE.

Flexgrid builds the power and physical foundation. Our partners bring the equipment, expertise, and compute. Together we deliver from electrons to output.

Strategic Compute Partner
Compute Layer

Modular data center deployment at existing power sites. Distribution-level interconnects. AI inference compute online in months, not years.

nodiac.ai ↗
Flexgrid develops AI-ready sites. Nodiac brings ModularDC deployment and AI compute demand.

Together we accelerate AI infrastructure deployment by combining power, land, infrastructure development, and modular compute platforms. Flexgrid originates and enables the powered sites; Nodiac deploys the modular data centers and compute on top.

Flexgrid Role
Power · Land · Shell · Interconnection
Nodiac Role
Compute · Deployment · Operations
Solar & Power Equipment
Monitoring & Controls
Utility & Grid
Construction & Civil
Professional Services
Interested in Partnering?

BUILD THE BACKBONE WITH US.

We work with equipment vendors, technology providers, contractors, utilities, and infrastructure investors.

Get In Touch
Ecosystem

BUILDING THE
BACKBONE OF AI
TOGETHER.

A strategic ecosystem connecting landowners, energy developers, utilities, infrastructure investors, technology providers, and AI operators to accelerate the deployment of powered, compute-ready infrastructure.

Why It Exists

AI GROWTH IS NO LONGER CONSTRAINED BY DEMAND. IT IS CONSTRAINED BY ACCESS TO POWER, LAND, CONNECTIVITY, AND DEPLOYABLE INFRASTRUCTURE.

The Flexgrid Ecosystem brings together the organizations required to solve these challenges and accelerate AI infrastructure deployment — turning critical assets into AI-ready opportunities.

Five Ways In

FIND YOUR PLACE
IN THE ECOSYSTEM

Whether you bring power, land, infrastructure, capital, or technology — there is a path to build with us.

01
ENERGY PARTNERS

Utilities, Independent Power Producers (IPPs), renewable energy developers, and battery storage operators. We help unlock new value from energy assets through AI-ready infrastructure development.

Utilities · IPPs · Renewables · Storage
02
LAND PARTNERS

Owners of powered land, industrial sites, business parks, and strategic infrastructure locations. We identify, evaluate, and develop sites capable of supporting AI infrastructure.

Powered Land · Industrial · Business Parks
03
INFRASTRUCTURE PARTNERS

Data center operators, modular infrastructure providers, colocation providers, and network operators. Together we accelerate deployment and reduce time-to-market.

Data Centers · Modular · Colo · Network
04
CAPITAL PARTNERS

Infrastructure funds, private equity firms, family offices, and strategic investors. Access opportunities across digital infrastructure, energy, and AI development.

Infra Funds · PE · Family Offices
05
TECHNOLOGY PARTNERS

GPU providers, cooling technologies, software platforms, AI operators, and cloud providers. Enabling scalable AI deployment through integrated infrastructure solutions.

GPU · Cooling · Software · AI Operators · Cloud
The Flexgrid Advantage

ONE INTEGRATED
DEVELOPMENT PLATFORM

Power, land, infrastructure, connectivity, and AI compute — integrated into a single development platform.

POWER
+
LAND
+
INFRASTRUCTURE
+
CONNECTIVITY
+
AI COMPUTE
FASTER DEPLOYMENT
Modular, scalable solutions that reduce time-to-market.
ENERGY-FIRST STRATEGY
Infrastructure designed around reliable, efficient power.
SCALABLE DEVELOPMENT
From edge deployments to large-scale AI campuses.
Join the Ecosystem

BRING POWER, LAND, INFRASTRUCTURE,
CAPITAL, OR TECHNOLOGY.

Flexgrid helps transform critical assets into AI-ready infrastructure opportunities. Let's build the backbone of AI together.

Join the Ecosystem
For Landowners

MONETIZE YOUR
POWERED LAND.

If you own land with power availability, interconnection, or proximity to fiber — you own one of the most valuable assets in the AI economy. Flexgrid helps you unlock its value.

Start a Conversation
What You Bring
POWERED LAND
Sites with existing or accessible power — 5 to 500+ acres.
INTERCONNECTION
Land near substations, transmission, or distribution infrastructure.
INDUSTRIAL ZONING
Industrial sites, business parks, or strategically located parcels.
FIBER PROXIMITY
Locations near carrier-neutral fiber routes — a major advantage.
What You Get
LAND VALUE UNLOCKED
We evaluate, develop, and structure deals that turn raw land into AI-ready infrastructure revenue.
LONG-TERM INCOME
Lease, joint venture, or sale structures designed around your goals.
FULL DEVELOPMENT
We handle entitlements, interconnection, design, and buildout — you don't lift a finger.
SPEED
Distribution-connected, utility-first model means faster paths to revenue than traditional development.
Why Flexgrid

YOUR LAND. OUR PLATFORM.
SHARED UPSIDE.

Flexgrid has evaluated sites across 20+ US states with a utility-first, distribution-connected development model.

EVALUATE

We assess your site's power, zoning, fiber, and interconnection potential at no cost to you.

STRUCTURE

Lease, JV, or acquisition — we structure the deal that matches your objectives.

DEVELOP

End-to-end development into AI-ready infrastructure, fully managed by Flexgrid.

Let's Talk

HAVE POWERED LAND?
LET'S EVALUATE IT.

Send us your site details and we'll assess its AI infrastructure potential — at no cost.

Contact Us
For Utilities

AI INFRASTRUCTURE
FOR UTILITIES.

AI is driving the largest surge in electricity demand in a generation. Flexgrid partners with utilities and IPPs to turn that load growth into structured, distribution-connected AI infrastructure development.

Start a Conversation
What You Bring
GENERATION CAPACITY
Available or planned capacity at distribution or transmission level.
INTERCONNECTION POINTS
Substations and feeders with headroom for new large loads.
SERVICE TERRITORY
Land and grid infrastructure within your operating footprint.
LOAD-GROWTH MANDATE
A need to attract and structure large, creditworthy load.
What You Get
STRUCTURED LOAD GROWTH
Predictable, well-structured large-load customers that fit your planning.
DISTRIBUTION-FIRST MODEL
Sites ≤20 MW on distribution avoid transmission queue bottlenecks.
FASTER ENERGIZATION
A utility-first development model designed around your processes.
LONG-TERM PARTNERSHIP
Ongoing pipeline of AI infrastructure projects across your territory.
Why Flexgrid

A UTILITY-FIRST
DEVELOPMENT MODEL.

Flexgrid is built around working directly with utilities — not around them. Distribution-connected, no transmission queue exposure.

DISTRIBUTION-CONNECTED

Sites sized to interconnect at distribution voltage — avoiding multi-year transmission studies.

CREDITWORTHY LOAD

Structured, financeable AI infrastructure projects backed by real demand.

ERCOT & BEYOND

Active across ERCOT and 20+ states, working with utility partners like Oncor.

Let's Talk

GROWING AI LOAD
IN YOUR TERRITORY?

Let's discuss how Flexgrid can structure AI infrastructure development with your utility.

Contact Us
For Investors

INFRASTRUCTURE
INVESTMENT
OPPORTUNITIES.

Flexgrid offers infrastructure funds, private equity, family offices, and strategic investors access to opportunities across digital infrastructure, energy, and AI development — in two of the world's most important markets.

Start a Conversation
What You Bring
INFRASTRUCTURE CAPITAL
Equity or debt for development-stage and operating AI infrastructure assets.
STRATEGIC ALIGNMENT
A thesis on AI, energy transition, and digital infrastructure.
LONG-TERM HORIZON
Patient capital aligned with infrastructure development timelines.
PORTFOLIO SCALE
Appetite to deploy across multiple projects and geographies.
What You Get
DUAL-MARKET ACCESS
Exposure to both US and India AI infrastructure development.
INTEGRATED PLATFORM
Energy + land + infrastructure + compute under one development platform.
DEVELOPMENT PIPELINE
Access to a 1,400+ MW pipeline across solar, BESS, powered land, and AI data centers.
ENERGY-FIRST RISK PROFILE
A power-first model that de-risks the hardest constraint in AI infrastructure.
Why Flexgrid

TWO MARKETS.
ONE INTEGRATED THESIS.

Few platforms can offer credible US and India AI infrastructure development under one roof. Flexgrid does.

1,400+
MW PIPELINE

Across solar, BESS, powered land, and AI data centers.

2
MARKETS

United States and India — both with strong AI infrastructure demand.

20+
STATES

Evaluated across the US with a utility-first model.

14
PARTNERS

An established ecosystem of equipment, engineering, and advisory partners.

Proof of Concept · Live Today

A 5 MW solar farm is energized at our Colorado City, Texas flagship site.

Modular compute and 4-hour storage are in active development on-site (targeted Q4 2026), with a second 5 MW project replicating the full configuration (solar + battery + load + modular DC) targeted for Q3 2027 — and ~50 MW identified in the Permian Basin region in coordination with Oncor. The distributed aggregation model, already in the field and repeating.

Pipeline figures reflect projects in development and under evaluation. Detailed materials available under NDA.

Let's Talk

EXPLORING AI
INFRASTRUCTURE EXPOSURE?

Request access to our investment materials and development pipeline overview.

Contact Us
For Operators

ACCELERATE AI
CAPACITY
DEPLOYMENT.

Data center operators, colocation providers, and AI platform companies need power and sites faster than the market can deliver. Flexgrid originates and develops the powered infrastructure so you can deploy compute in months, not years.

Start a Conversation
What You Bring
COMPUTE DEMAND
GPU, inference, or colocation workloads needing rapid capacity.
DEPLOYMENT TIMELINE
An urgent need for power and space the traditional market can't meet.
OPERATIONAL EXPERTISE
Your data center operations, hardware, and customer relationships.
SCALE REQUIREMENTS
Capacity needs from single sites to multi-site campaigns.
What You Get
POWERED SHELLS
Move-in-ready powered land and shell infrastructure at distribution-connected sites.
SPEED TO POWER
A utility-first model that compresses the slowest part of deployment.
MODULAR CAPACITY
1–20 MW per site, scalable across a distributed footprint.
TURNKEY DEVELOPMENT
Power, land, interconnection, and shell — fully developed and delivered.
AGGREGATED DISTRIBUTED CAPACITY
Multiple distribution-connected sites fiber-aggregated within a ~35-mile radius into 50–100 MW — hyper-dense, liquid-cooling-ready, deployed where power already exists.
Why Flexgrid

WE BUILD THE POWER.
YOU DEPLOY THE COMPUTE.

Flexgrid solves the hardest, slowest part of AI capacity — the powered infrastructure underneath it.

MONTHS, NOT YEARS

Modular, distribution-connected development compresses timelines dramatically.

DISTRIBUTED FOOTPRINT

Multiple sites across 20+ states — deploy capacity where you need it.

COMPUTE-READY

In partnership with Nodiac, sites are engineered for rapid AI compute deployment.

Let's Talk

NEED AI CAPACITY
FASTER?

Tell us your power and timeline requirements — we'll show you what's deployable.

Contact Us
About

WE BELIEVE AI
RUNS ON ENERGY.
WE BUILD BOTH.

Flexgrid is building the backbone of AI by developing the infrastructure that makes intelligence possible — through the integration of power, land, connectivity, and digital infrastructure.

Company
Vision
LEADING AI-READY INFRASTRUCTURE

To become a leading developer of AI-ready digital infrastructure, enabling the world's transition to an AI-driven economy.

Mission
ACCELERATE AI ADOPTION

To accelerate AI adoption through scalable, energy-efficient, and resilient infrastructure solutions that connect power, land, connectivity, and compute.

Positioning
AI-READY DIGITAL INFRASTRUCTURE

Flexgrid is building the backbone of AI by developing the infrastructure that makes intelligence possible. Through the integration of power, land, connectivity, and digital infrastructure, we enable organizations to deploy AI faster, more efficiently, and at scale.

Our Entities
🇺🇸 United States
FLEXGRID DIGITAL INFRA LLC
21831 Blossom Brook Lane
Katy, Texas 77450, USA

🇮🇳 India
FLEX GRID INFRA PRIVATE LIMITED
6-3-788/36&37A, Ameerpet, Durganagar Colony
Begumpet, Secunderabad, Hyderabad — 500016, Telangana, India

Why Flexgrid

FIVE REASONS PARTNERS CHOOSE US.

01
INTEGRATED EXPERTISE

Energy, land, connectivity, and data center development under one platform. No handoffs. No gaps.

02
AI-READY BY DESIGN

Purpose-built infrastructure optimized for AI workloads from day one — not retrofitted.

03
ACCELERATED DEPLOYMENT

Modular and scalable solutions that reduce time-to-market versus traditional development paths.

04
ENERGY-FIRST APPROACH

Infrastructure designed around reliable, efficient power. Energy is the foundation.

05
SCALABLE GROWTH

From edge nodes to hyperscale campuses — the same platform, engineered to grow.

Join Us

BUILDING THE BACKBONE OF AI.

Partnership, investment, or project inquiry — we want to hear from you.

Contact Us
Contact

LET'S BUILD
SOMETHING
TOGETHER.

Whether you have a site, a power need, a technology partnership, or an investment inquiry — we want to hear from you.

Our Offices
🇺🇸 United States
FLEXGRID DIGITAL INFRA LLC
21831 Blossom Brook Lane
Katy, Texas 77450, USA

🇮🇳 India
FLEX GRID INFRA PRIVATE LIMITED
6-3-788/36&37A, Ameerpet, Durganagar Colony
Begumpet, Secunderabad, Hyderabad — 500016, Telangana, India

Send a Message

TELL US ABOUT YOUR PROJECT

Opens your email client pre-filled · Sends to info@flexgridinfra.com